art

CSD Facilities Update:

23 March, 2023

 

Demolition and Sanitizing:

  • Academic Wings
    • Demolition in the academic wings is completed as of today
    • Sanitizing is being completed in the K-2 and 3-5 Wings today
    • The flood cut in the library will be sanitized tomorrow for drying to occur over the weekend
  • Gym
    • The gym floor demolition is scheduled to begin Monday.
    • Movers have relocated materials from the gym to locations within the building and to off-site storage this week
    • The entire gym floor will be replaced

 

Air Quality Testing

  • Pre-occupancy air sample tests are slated for early next week
    • Results will be back by early the week after next
    • If the test results are positive and we receive clearance to reoccupy parts of the building, we will continue with our phased reopening plan with moving 7-8 back into the building as soon as is practicable.
    • To minimize the loss of any further instructional time, materials will be moved over the weekend or during vacation.
    • Construction areas are being / will be sealed off from the rest of the building.

 

Construction/Reconstruction

  • Sheetrock has arrived on site and is in the process of being installed throughout the flood impacted areas
  • Painters will be following along behind the sheetrock crews
  • Flooring/Carpets will be installed after the painting is complete

 

Have a great weekend!

Bob